Show the job before it's built.
Draw the building line and the scaffold builds itself — TG20-style in 3D, with a counted gear list, true hire value and a priced quote in minutes.
Existing clients get launch pricing · Plugs straight into your projects, quotes & meterage


Brickwork, boarded lifts, bracing, ties and a system staircase — set out on a true 2 m bay grid, exactly how the gang would build it.

Every tube and board coloured by stock length, so the gear list is right and the wagon is loaded off the screen before anything leaves the yard.
From a building line to a priced quote.
Draw the job once and the model does the rest — sets out the scaffold, prices it, counts the gear and puts a 3D model on the quote.
Draw the building line
Sketch the footprint and set the heights — no CAD, no training day. If you can draw the outline, you can build the job.
The scaffold builds itself
Bays, lifts, boards, braces, ties, ladders and corner details set out to real TG20-style rules — the way the gang would erect it.
Priced as you draw
Boarded and unboarded metreage, ladders, stairs, loading bays and sheeting total live and land straight on the quotation.
Counts every fitting
A gear list off the model itself — tube by stock length, boards by size, fittings, ties and toe boards. Load the wagon off the screen.
True hire & asset value
The weekly hire cost and the kit value standing on the job, counted from the actual gear on the scaffold — not a guess.
Kit view & board configurator
Colour every tube and board by stock size and flick the building off, so the yard can check the kit before it leaves.
A 3D model on every quote.
Be first in the queue when it launches — existing clients get launch pricing.